Many carbon steel pipes are now produced using high frequency welded pipe equipment units, but when purchasing high frequency welded pipe equipment units, you will be faced with a difficult choice. That is, the quotation of each welded pipe equipment unit is different. I don’t know how. Choose, and I don’t know how big the cost difference is. Here I will tell you for your reference in the future.
The differentiation of high-frequency welded pipe equipment units is generally two pieces, one is the difference in hardware prices, and the other is the difference in software prices. Let’s first look at the hardware price difference, that is, the configuration difference. For example, the difference in materials will not be too big, but the accessories are different, such as the brand of the motor model, the brand of the electronic control system, and the configuration. The difference, these differences are very big. Take the high-frequency welding machine for example, the price of the domestic welding machine of the same power and the American Sematoer is not one and a half, and the difference is several times. This difference is only It is very big. Another big difference is the cutting machine, whether hot saw or cold saw is used. The price is also quite different. Moreover, the storage mechanism is the choice of storage cage or spiral looper. This difference is not small. , As long as these differences are compared, the differences in hardware will be clear.
Let’s talk about the software differences of high-frequency welded pipe equipment units. This is the calculation of labor costs, plant costs, and production cycle costs. A high-frequency welded pipe equipment manufacturer can produce units and labor per month as well as plant investment. The cost of calculation is different. If the shipment volume is large in one month, the efficiency will be high. The cost evenly allocated to each high-frequency welded pipe equipment unit will be less, and vice versa. Taller.
If you observe or consider these when purchasing high-frequency welded pipe equipment units, you can basically perceive which equipment should be selected by comparing prices.
Key words:high frequency welded pipe equipment unit
Foshan GXG Technology Co., Ltd
web: http://www.fsgxiug.com
Tel: 86-18820879368(Wechat-Whatsapp)
E-mail: 345291578@qq.com
Next : How to select supporting equipment for welded pipe mechanical equipment Back
Home
- [2021.06.05]How to find a good welde…
- [2022.10.22]Why do some stainless st…
- [2023.08.25]Successful debugging of …
- [2021.06.05]Design of stainless stee…
- [2023.07.05]Advantages of servo cutt…
- [2020.06.08]The market momentum behi…
- [2021.06.04]Where is the competitive…
- [2022.10.12]Bending Method of Specia…
- [2021.06.04]Can stainless steel deco…
- [2023.06.07]How long does it take fo…
- [2021.06.03]How to choose the automa…
- [2022.09.16]What are the classificat…
- [2023.04.25]The Forming Method of We…
- [2021.06.02]Secondary finishing proc…
- [2021.06.02]Why is there baffle behi…
- [2022.09.13]Design method of interna…
- [2022.12.27]Material storage mode of…
- [2021.06.01]How to design compound p…
- [2021.05.31]Why do welding pipe equi…
- [2022.08.19]Is it true that you can …