Welcome To Foshan GXG Technology Co., LTD

Planning — Purchasing — Supporting — Installation — Training — Maintaining

CHINA'S PROFESSIONAL CONVENIENT PRECISION EFFICIENT STABLE METAL PIPE-COIL EQUIPMENT MANUFACTURER

One-stop turnkey engineering manufacturing service provider for metal pipe & coil industry chain

To be a CUSTOMER FOCUS & HONEST & WIN-WIN enterprise

 +86-18820879368
 gxiug@qq.com
What to do if the welding pipe machinery is overloaded

Publisher:Gxiug   Addtime:10/14/2022 10:49:58 AM  Views:

It is believed that many friends engaged in the welding pipe industry have encountered a situation, that is, when debugging or running, the welding pipe machinery suddenly has an overload fault and shuts down. If this happens, what should we do and how to deal with it? Today, I would like to share my personal experience with you.


If the welding pipe machinery is overloaded and shut down during commissioning or operation, do not panic. Calm down. Do not rush to deal with it because you are afraid of affecting the output, which will only increase the useless time consumption. If it happens during the trial run, as long as there is no problem with the mechanical part, it is basically a problem with the frequency converter. It may be a fault with the frequency converter, or it may be a problem with the parameter setting. Most of the problems I encounter are the setting of the frequency converter. Just reset the parameters of the frequency converter. If there is no problem with the frequency converter, it is necessary to check the mechanical part, but this is basically not the case. At least, this has not happened to my equipment at present.

If the overload protection fault occurs during operation, the best way to deal with it is to shut down the whole welding pipe machinery production line, and turn off the power supply from the source and restart it. Because sometimes part of the start stop effect is not good. I have encountered this situation. If it is still unstable, it is the relay reset problem. Sometimes people feel that we have reset the control panel, In fact, there is no reset in the electric cabinet, and the problem cannot be solved finally.

The above are some of the situations and handling methods I summarized in my daily installation, debugging and operation about the overload ofwelding pipe machinery, which are only for your reference.

Key words:welding pipe machinery

Foshan GXG Technology Co., Ltd

web: http://www.fsgxiug.com

Tel: 86-18820879368(Wechat-Whatsapp)

E-mail: 345291578@qq.com


Hotline:+86-18820879368

Tell:+86-0757-81162338

Fax:+86-0757-81162338

Email:gxiug@qq.com

Add:1040 Fuhong Plaza, 1 Yanjiang North Road, Luocun Street, Nanhai District, Foshan City, Guangdong Province

Mobile phone
scan

Copyright 2019 Gxiug Copyright 粤ICP备17022122号

Technical support:Ceall

服务热线:
18820879368

邮箱:

gxiug@qq.com