Yesterday, an old customer of mine asked me about the processing process and some details of the welded pipe mold. He may also indicate the requirements when purchasing in the future. This is not important. We all strictly implement it in order to have a clear understanding of the processing and production of our welded pipe mold in the future, We GXG technology will give you an analysis of the processing process of our welded pipe mold for your understanding.
The processing of welded pipe molds is first of all the selection of materials. In addition to the distinction between composition and brand, the size should also be considered. Some die steel bars and some need to use forging materials. This is different. If it is die steel bars, it needs to be cut according to the die size to obtain the die blank, and then process the blank, For punching and rough turning, we generally recommend rough turning first and then drilling, so as to control the flatness and runout rate. How to control the arc position during rough turning of the die? Here, it is necessary to use the chuck. The chuck type performs arc machining in advance, but it will leave allowance for the subsequent finishing machining. When NC finishing turning is completed on the lathe, it can be operated. Whether it is finish turning or rough turning, after the die is fixed, One action that must be done is to check the fixed standard of the die with the runout table. Our standard is to ensure that the rotation runout of the die is within 1-2 wires, so as to ensure the machining accuracy and runout floating of the die. In this way, the die can be officially started for machining.
After the machining of welded pipe molds, heat treatment is carried out. After the heat treatment, some welded pipe molds with low requirements are directly packaged and shipped. For molds with high requirements, two steps need to be carried out, that is, secondary finish turning and surface finish grinding. The purpose of secondary finish turning is to ensure the deformation reduction after heat treatment, Finish grinding is to ensure the smoothness and smoothness of the surface.
When all this is done, the instrument is used to check whether the hole standard meets the requirements. If it meets the requirements, the surface is wiped clean, coated with antirust oil, packaged and shipped.
After reading so much about the analysis of the processing process of welded pipe molds, do you recognize the professionalism of the production process of our GXG technology SW-Shengwei technology? Anything, as long as we do it seriously and carefully, will not be worse.
Key words:welded pipe mold
Foshan GXG Technology Co., Ltd
web: http://www.fsgxiug.com
Tel: 86-18820879368(Wechat-Whatsapp)
E-mail: 345291578@qq.comNext : Why does stainless steel pipe making machine rarely use storage bin - GXG technology Back
Home
- [2022.10.17]Difference between AGC a…
- [2022.10.14]What to do if the weldin…
- [2023.07.12]What is the effect of di…
- [2020.06.03]Stainless steel large th…
- [2023.07.03]How to use a level to ad…
- [2021.06.04]Influence of welded pipe…
- [2022.10.10]What are the wearing par…
- [2023.06.27]Planning and Design of C…
- [2022.10.08]Can stainless steel pipe…
- [2023.06.21]How to Protect the Surfa…
- [2023.06.16]Adjustment Method for Gr…
- [2020.06.03]The design methods of sl…
- [2021.06.03]How to select the materi…
- [2023.06.09]Pressure mode of interna…
- [2021.06.03]Does drawing die belong …
- [2022.09.22]Quick change mode of wel…
- [2023.06.06]Common use of welding pi…
- [2022.09.19]What to do if the stainl…
- [2020.06.01]Is the welded pipe mold …
- [2021.06.02]Is the width of welded p…